Wholesale supplier avaliable worldwide

Transforming Tile Projects with Precision and Quality Since 1986

"A green tile leveling device with a threaded spindle is prominently displayed on a gray tiled floor

1. PLACE AND SPIN

Place the first tile on the adhesive. Before placing the next tile, insert screws/spacers. You can find the number of screws/spacers per tile on the table that comes with the product.

A hand fine-tuning a green tile leveling device on a white floor, with a close-up on the fingers gripping the adjustable top, and additional levelers in soft focus in the background.

2. TIGHTEN AND LEVEL

After the next tile is placed and aligned with the first, place the caps on the screws/spacers.

Place the appropriate caps on the screws/spacers to lock the tiles at the same height.

The pressure applied will help the tiles to perfectly level with each other.

A foot in a black sneaker approaching a green tile leveling device on a white tiled floor, surrounded by multiple other leveling devices, providing perspective on the tile installation process.

3. REMOVE THE LEVELERS

After the adhesive has fully set, it's time to remove the caps. Use a leveling tool or pliers to loosen and unscrew the caps from the screws/spacers.

Levelers from the floor tiles can be removed with a gentle kick.

Collect all the removed caps and spacer parts. The space between the tiles should now be clean for grouting.

Additional
advice
Always refer to the specific instructions that are included with your tile leveling system.

Practice placing and removing a few screws and caps before starting work on the main project to gain a sense of the pressure needed to level the tiles without applying excessive force.